Part No. 115621-A Rev. AJanuary 1997 Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms
115621-A Rev. A xiii Tables Table 2-1. Meaning of FRE LEDs 1 through 8 During Diagnostics ...2-2Table 2-2. Meaning of FRE L
115621-A Rev. A xv About This Guide Read this guide if you are responsible for installing a System Resource Module-Front (SRM-F), Fast Routing Eng
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platformsxvi 115621-A Rev. A Conventions bold text Indicates text that you need to enter
115621-A Rev. A xvii Technical Support and Online Services To ensure comprehensive network support to our customers and partners worldwide, Bay Netw
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platformsxviii 115621-A Rev. A Bay Networks Customer Service If you purchased your Bay Networ
Technical Support and Online Services 115621-A Rev. A xix Bay Networks Information Services Bay Networks Information Services provide up-to-date sup
ii 115621-A Rev. A4401 Great America Parkway 8 Federal StreetSanta Clara, CA 95054 Billerica, MA 01821 Copyright © 1988–1997 Bay Networks, Inc. All r
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platformsxx 115621-A Rev. A Support Source CD This CD-ROM -- sent quarterly to all contracted
Technical Support and Online Services 115621-A Rev. A xxi InfoFACTS InfoFACTS is the Bay Networks free 24-hour fax-on-demand service. This automated
115621-A Rev. A 1-1 Chapter 1Installing the Processor Module Complete these tasks as needed to install the processor module:1. Remove the front beze
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-2 115621-A Rev. A The BN hot-swap feature allows you to install and remove processo
Installing the Processor Module 115621-A Rev. A 1-3 Figure 1-2. Removing the BLN-2 Front Bezel To remove the front bezel from the BCN (Figure 1-3):
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-4 115621-A Rev. AFigure 1-3. Removing the Front Bezel from the BCNPOWERRUNBOOTDIAGB
Installing the Processor Module115621-A Rev. A 1-5 Removing the EMC ShieldYou must remove the EMC shield to access the slots for processor modules in
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-6 115621-A Rev. AFigure 1-4. BLN and BCN EMC ShieldsPOWERRUNBOOTDIAGB A C K B O N E
Installing the Processor Module115621-A Rev. A 1-7 Choosing a SlotYou can install a FRE or FRE-2 processor module in• Slots 2 through 5 in the BLN pla
115621-A Rev. A iii Electromagnetic Emissions Meets requirements of:FCC Part 15, Class AEN 55 022 (CISPR 22:1985), Class A <and Class B>VCCI
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-8 115621-A Rev. AFigure 1-6. Location of Processor Modules and the SRM-F in a BLN-2
Installing the Processor Module115621-A Rev. A 1-9 Figure 1-7. Location of Processor Modules and the SRM-F in a BCNSRM-FPOWERRUNBOOTDIAGB A C K B O N
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-10 115621-A Rev. ARemoving the Board Retainer Bracket (BLN and BLN-2 Only)If you hav
Installing the Processor Module115621-A Rev. A 1-11 Figure 1-9. Removing an Air Flow ModuleRemoving a Processor ModuleWhen removing a processor module
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-12 115621-A Rev. ATo remove a processor module:1. Gently pull the inside of the boar
Installing the Processor Module115621-A Rev. A 1-13 Figure 1-11. Location of Power Switch on FRE Module and SRM-F2.Holding the board extractors open,
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms1-14 115621-A Rev. A• If diagnostics determine that the FRE/FRE-2 is not functional, t
115621-A Rev. A 2-1 Chapter 2Using Switches and LEDsThis chapter describes the switches and status indicator lights (LEDs) on the SRM-F and FRE/FRE-
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms2-2 115621-A Rev. A FRE Module Switch and LEDsThe front edge of each FRE module has
Using Switches and LEDs115621-A Rev. A 2-3 Table 2-2 describes the meaning of LEDs 1 through 8 when LED F is also on (LED F turns on when the GAME o
iv 115621-A Rev. A Canada Requirements Only (continued) D. O. C. Explanatory Notes: Equipment Attachment Limitations The Canadian Department of Com
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms2-4 115621-A Rev. A LEDs A through P, the power switch, and the Flash memory card e
Using Switches and LEDs115621-A Rev. A 2-5 FRE-2 Module Switch and LEDsThe front edge of each FRE-2 module has several status LEDs, an HDCM (Harpoon
Installing SRM-F and FRE/FRE-2 Processor Modules in BN Platforms2-6 115621-A Rev. A Table 2-6 describes the meaning of LEDs A through P when on.LED
Using Switches and LEDs115621-A Rev. A 2-7 Table 2-7 describes the meaning of LEDs Q through X when LED F is also on (LED F turns on when the GAME o
115621-A Rev. A v Canada Requirements Only (continued) Canadian Department of Communications Radio Interference Regulations This digital apparatus
vi 115621-A Rev. A Bay Networks Software License This Software License shall govern the licensing of all software provided to licensee by Bay Networ
115621-A Rev. A vii Bay Networks Software License (continued) 9. Licensee shall not reverse assemble, reverse compile, or in any way reverse engin
115621-A Rev. A ix Contents About This Guide Conventions .......................
Comments to this Manuals