Avaya (109352-E, User Manual Page 1

Browse online or download User Manual for Unknown Avaya (109352-E,. Avaya (109352-E, User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 144
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - BN Platforms

Installing and MaintainingBN Platforms Part No. 109352-E Rev. ADecember 1996

Page 2

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Bay Networks Software License (continued)

Page 3 - USA Requirements Only

Installing and Maintaining BN Platforms5-4 109352-E Rev. AFigure 5-1. Removing a Flash or PCMCIA SRAM Memory CardTo install a Flash or PCMCIA SRAM mem

Page 4 - Bay Networks, Inc

Hot-Swapping Hardware Components109352-E Rev. A 5-5 Protecting Memory Card FilesBay Networks ships each memory card with its Read-Write Protect switch

Page 5 - Canada Requirements Only

Installing and Maintaining BN Platforms5-6 109352-E Rev. AFigure 5-2. Memory Card Read-Write Protect Switch4.Reinsert the memory card into the card re

Page 6

Hot-Swapping Hardware Components109352-E Rev. A 5-7 To replace the 3-V lithium battery:1. Insert a slender pointed object, such as the end of a paper

Page 7

Installing and Maintaining BN Platforms5-8 109352-E Rev. AWhen removing or installing a link module, keep the following in mind:• If you replace a lin

Page 8 - T1 Service

Hot-Swapping Hardware Components109352-E Rev. A 5-9 Figure 5-3. Link Modules and the SRM-L in a BLN Remove a link module or SRM-L as follows:1. Discon

Page 9 - Bay Networks Software License

Installing and Maintaining BN Platforms5-10 109352-E Rev. AFigure 5-4. Link Modules and the SRM-L in a BLN-2 COM 1DSTXCVRFAILRLDS2RYELNSRTRCVRWFAILRL

Page 10 - (continued)

Hot-Swapping Hardware Components109352-E Rev. A 5-11 Figure 5-5. Link Modules and the SRM-L in a BCNInstall a link module or SRM-L as follows:1. Slide

Page 11 - Contents

Installing and Maintaining BN Platforms5-12 109352-E Rev. A4. Connect the desired cables to the module.Replacing a Routing Engine Module or SRM-FThe B

Page 12

Hot-Swapping Hardware Components109352-E Rev. A 5-13 • Before removing or installing a module, you must first access the interior of your hardware plat

Page 13

109352-E Rev. A xi Contents About This Guide Audience ...

Page 14

Installing and Maintaining BN Platforms5-14 109352-E Rev. AFigure 5-7. Routing Engine Modules and the SRM-F in a BLN-2Note: Only Slot 1 (the bottom sl

Page 15

Hot-Swapping Hardware Components109352-E Rev. A 5-15 Figure 5-8. Routing Engine Modules and the SRM-F in a BCNSRM-FPOWERRUNBOOTDIAGB A C K B O N E N

Page 16

Installing and Maintaining BN Platforms5-16 109352-E Rev. ARemove a routing engine module or SRM-F as follows:1. Gently pull the inside of the board e

Page 17

Hot-Swapping Hardware Components109352-E Rev. A 5-17 3.Swing the extractors forward to lock the board in place.4. Observe the module and front-panel L

Page 18

Installing and Maintaining BN Platforms5-18 109352-E Rev. A6. Replace the EMC shield and front bezel. (Refer to Chapter 4, “Accessing the Interior,” f

Page 19 - About This Guide

Hot-Swapping Hardware Components109352-E Rev. A 5-19 To keep the BCN RLC powered up while you turn off a power switch or remove a power cord for a pow

Page 20 - <ip_address>

Installing and Maintaining BN Platforms5-20 109352-E Rev. AIf you end up with a negative number, the power supplies cannot support the ILI configuratio

Page 21 - Acronyms

Hot-Swapping Hardware Components109352-E Rev. A 5-21 Figure 5-10. Removing a Power Module from a BLN-2

Page 22

Installing and Maintaining BN Platforms5-22 109352-E Rev. AInsert a BLN-2 power module as follows:1. Grasp the handle and guide the module into the de

Page 23

Hot-Swapping Hardware Components109352-E Rev. A 5-23 Figure 5-11. Removing a Power Module from a BCNInsert a BCN power module as follows:1. Grasp the

Page 24

xii 109352-E Rev. A Powering On the BLN ...1-12LED A

Page 25 - Customer Service FTP

Installing and Maintaining BN Platforms5-24 109352-E Rev. AIf the Power OK LED does not turn on, contact the Bay Networks Technical response Center.Re

Page 26 - CompuServe

Hot-Swapping Hardware Components109352-E Rev. A 5-25 Figure 5-12. Double-Fan Tray in the BLN-2Remove a single-fan tray from the rear of the BLN-2 as f

Page 27 - How to Get Help

Installing and Maintaining BN Platforms5-26 109352-E Rev. AFigure 5-13. Single-Fan Trays in the BLN-2Insert a fan tray as follows:1. Grasp the bottom

Page 29 - Chapter 1

Installing and Maintaining BN Platforms5-28 109352-E Rev. A

Page 30 - Backbone Link Node Overview

109352-E Rev. A 6-1 Chapter 6Switches and LEDsRead this chapter for a description of the switches and LEDs on the front-panel of each Backbone Node ha

Page 31 - Preparing for Installation

Installing and Maintaining BN Platforms6-2 109352-E Rev. AReset SwitchThe Reset switch warm-starts the hardware platform. A warm-start is equivalent t

Page 32 - Additional Equipment

Switches and LEDs109352-E Rev. A 6-3 620-Watt Power Module LEDThis section describes the function of the green Power OK LED on each of the 620-watt BL

Page 33 - Site Requirements

Installing and Maintaining BN Platforms6-4 109352-E Rev. AFigure 6-2. 620-Watt Power Module Power OK LEDThe Power OK LED indicates that the hardware p

Page 34 - Table 1-4. BLN Dimensions

109352-E Rev. A A-1 Appendix ADial-Up Services ModemsThis appendix lists some modems that support Version 7 Dial-Up Services and provides configuration

Page 35 - Attaching Angle Brackets

109352-E Rev. A xiiiEnvironmental Requirements ...3-8Setting Up the Backbone

Page 36

Installing and Maintaining BN PlatformsA-2 109352-E Rev. AAdtran DSU III ARV.35 connection and V.25bis setup:# from front panel to get menu3 Config1 Lo

Page 37 - Installing the BLN

Dial-Up Services Modems109352-E Rev. A A-3 Codex 3260RS-232 connection using Raise DTR setup:ACU OptionsAT Form: DTR Dial (originating side), Sync Dat

Page 38

Installing and Maintaining BN PlatformsA-4 109352-E Rev. ACodex 3261 FastV.25bis setup:ACU Options Terminal OptionsACU Select = v25b DTE Rate = 9600AT

Page 39 - 109352-E Rev. A 1-11

Dial-Up Services Modems109352-E Rev. A A-5 Multi-Tech Multi-ModemV.25bis setup:DIP Switches1 : up2 : up3 : down4 : up5 : up6 : down7 : up8 : down9 : d

Page 40 - Powering On the BLN

Installing and Maintaining BN PlatformsA-6 109352-E Rev. ANEC N6450 Data Service Unit V.25bis setup:DTEDTE Command Set = V.25 SyncV.35TX Clock = NormD

Page 41 - LED Activation Sequence

Dial-Up Services Modems109352-E Rev. A A-7 NEC N963E Plus (RS232)V.25bis setup:Jumpers1 : OFF2 : ON V.25bis3 : ON hdlc4 : OFF speed5 : OFF speed6

Page 42 - Local Connection

Installing and Maintaining BN PlatformsA-8 109352-E Rev. ATelebit T3000When configuring the modem, place the A/B switch in the A position. Configuration

Page 43 - Remote Connection

Dial-Up Services Modems109352-E Rev. A A-9 Telebit T3000 (continued)Raise DTR setup (continued):Answering Sideat&f16 – preset configurationatt – en

Page 44 - (continued)

Installing and Maintaining BN PlatformsA-10 109352-E Rev. ATylink SNS 4000 (V.35 ISDN PRI DSU) - Tested in back-to-back IMUX mode - Tested with V.25bi

Page 45 - Chapter 2

109352-E Rev. A Index-1 Aair flow moduleremoval and installation, 4-9 to 4-11air plenumBCN, 3-7BLN, 1-6BLN-2, 2-6altitude specificationsBCN, 3-8BLN, 1-7

Page 46 - Backbone Link Node-2 Overview

xiv 109352-E Rev. A Appendix A Dial-Up Services Modems Adtran DSU III AR ...

Page 47

Installing and Maintaining BN PlatformsIndex-2 109352-E Rev. ABLN, 1-14BLN-2, 2-15operating parametersBCN, 3-20BLN, 1-14BLN-2, 2-15Customer Service FT

Page 48

Index109352-E Rev. A Index-3 front bezel, removal and replacement of, 4-2 to 4-3front-panelSee also front bezelswitches and LEDs, 6-1GGAME operating s

Page 49

Installing and Maintaining BN PlatformsIndex-4 109352-E Rev. Aoperating parametersBCN, 3-22BLN, 1-15BLN-2, 2-16Oopening the router, 4-2 to 4-8operatin

Page 50 - Table 2-4. BLN-2 Dimensions

Index109352-E Rev. A Index-5 requirementsair plenumBCN, 3-7BLN, 1-6BLN-2, 2-6altitudeBCN, 3-8BLN, 1-7BLN-2, 2-7electricalBCN, 3-6BLN, 1-5BLN-2, 2-5env

Page 51

Installing and Maintaining BN PlatformsIndex-6 109352-E Rev. ATTechnician Interfaceaccessing from BLN, 1-14Technician Interface, accessing fromBCN, 3-

Page 52

109352-E Rev. A xv Figures Figure 1-1. Backbone Link Node (BLN) ...1-2Figure 1-2.

Page 53 - 1.4"

xvi 109352-E Rev. A Figure 4-7. Inserting or Removing an Air Flow Module ...4-10Figure 4-8. Grasping the Ai

Page 54 - 2-10 109352-E Rev. A

109352-E Rev. A xvii Tables Table 1-1. BLN Shipment Contents ...1-3Table 1-2.

Page 55 - Installing the BLN-2

xviii 109352-E Rev. A Table 6-1. Front-Panel LEDs ...6-2

Page 56

xix About This Guide If you are responsible for installing and configuring Bay Networks Backbone Node hardware platforms, read this guide for installa

Page 57 - Powering On the BLN-2

4401 Great America Parkway 8 Federal StreetSanta Clara, CA 95054 Billerica, MA 01821 Copyright © 1988–1996 Bay Networks, Inc. All rights reserved. Pr

Page 58

Installing and Maintaining BN Platformsxx Conventions angle brackets (< >) Indicate that you choose the text to enter based on the description

Page 59

-xxi Acronyms ANSI American National Standards InstituteARE ATM Routing EngineATM Asynchronous Transfer ModeBN Backbone NodeBCN Backbone Concentrator

Page 60

Installing and Maintaining BN Platformsxxii Ordering Bay Networks Publications To purchase additional copies of this document or other Bay Networks p

Page 61

109352-E Rev. A xxiii Technical Support and Online Services To ensure comprehensive network support to our customers and partners worldwide, Bay Net

Page 62

Installing and Maintaining BN Platformsxxiv 109352-E Rev. A Bay Networks Customer Service If you purchased your Bay Networks product from a distribu

Page 63 - Chapter 3

Technical Support and Online Services 109352-E Rev. A xxv Bay Networks Information Services Bay Networks Information Services provide up-to-date sup

Page 64 - 3-2 109352-E Rev. A

Installing and Maintaining BN Platformsxxvi 109352-E Rev. A Support Source CD This CD-ROM -- sent quarterly to all contracted customers -- is a compl

Page 65

Technical Support and Online Services 109352-E Rev. A xxvii InfoFACTS InfoFACTS is the Bay Networks free 24-hour fax-on-demand service. This automat

Page 67

109352-E Rev. A 1-1 Chapter 1Installing the Backbone Link NodeYou install the Backbone Link Node (BLN) hardware platform by• Preparing for installat

Page 68 - 3-6 109352-E Rev. A

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 USA Requirements Only Federal Communication

Page 69

Installing and Maintaining BN Platforms1-2 109352-E Rev. ABackbone Link Node OverviewThe Backbone Link Node is a multiprotocol hardware platform/bridg

Page 70

Installing the Backbone Link Node109352-E Rev. A 1-3 Preparing for InstallationTo prepare for the BLN installation, verify the following:• Your BLN sh

Page 71 - 109352-E Rev. A 3-9

Installing and Maintaining BN Platforms1-4 109352-E Rev. ACablesMake sure that you received the correct cables with your shipment. If you plan to buil

Page 72

Installing the Backbone Link Node109352-E Rev. A 1-5 Site RequirementsTo obtain satisfactory BLN performance, your site must meet all of the following

Page 73 - 109352-E Rev. A 3-11

Installing and Maintaining BN Platforms1-6 109352-E Rev. ASpace RequirementsMake sure the installation site is large enough for the BLN and provides s

Page 74 - Installing the BCN

Installing the Backbone Link Node109352-E Rev. A 1-7 Environmental RequirementsThe installation site must meet the environmental requirements listed i

Page 75

Installing and Maintaining BN Platforms1-8 109352-E Rev. Aa. If your rack does not have threaded holes, place cage nuts over the holes before you atta

Page 76

Installing the Backbone Link Node109352-E Rev. A 1-9 Figure 1-2. Attaching Angle Brackets to Support the BLNInstalling the BLNThis section describes h

Page 77 - 109352-E Rev. A 3-15

Installing and Maintaining BN Platforms1-10 109352-E Rev. AInstall the BLN in the rack as follows:1. Using both hands, pull the bottom of the front be

Page 78 - Source B power cord

Installing the Backbone Link Node109352-E Rev. A 1-11 Figure 1-4. Mounting the BLN to the RackReplace the front bezel as follows:1. Align the mounting

Page 79

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Japan/Nippon Requirements Only Voluntary Co

Page 80

Installing and Maintaining BN Platforms1-12 109352-E Rev. APowering On the BLNPower on the BLN as follows: 1. Ensure that the power switch on the rear

Page 81 - 109352-E Rev. A 3-19

Installing the Backbone Link Node109352-E Rev. A 1-13 LED Activation SequenceThe LEDs on the front panel of the BLN (Figure 1-5) activate while the BL

Page 82

Installing and Maintaining BN Platforms1-14 109352-E Rev. AThe BLN indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs

Page 83

Installing the Backbone Link Node109352-E Rev. A 1-15 Figure 1-6. Cabling the BLN to a ConsoleRemote ConnectionThis section describes how to cable you

Page 84

Installing and Maintaining BN Platforms1-16 109352-E Rev. A2. Remove the cable connector from the CONSOLE port of the System Resource Module-Link (SRM

Page 85 - Accessing the Interior

109352-E Rev. A 2-1 Chapter 2Installing the Backbone Link Node-2You install the Backbone Link Node-2 (BLN-2) hardware platform by• Preparing for insta

Page 86

Installing and Maintaining BN Platforms2-2 109352-E Rev. ABackbone Link Node-2 OverviewThe BLN-2 is a multiprotocol hardware platform and bridge desig

Page 87

Installing the Backbone Link Node-2109352-E Rev. A 2-3 Preparing for InstallationTo prepare for the BLN-2 installation, verify the following:• Your BL

Page 88 - Pull Top

Installing and Maintaining BN Platforms2-4 109352-E Rev. ACablesMake sure that you received the correct cables with your shipment. If you plan to buil

Page 89 - 109352-E Rev. A 4-5

Installing the Backbone Link Node-2109352-E Rev. A 2-5 Site RequirementsTo obtain satisfactory BLN-2 performance, your site must meet all of the follo

Page 90 - 4-6 109352-E Rev. A

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only Canada CS-03 Rules

Page 91 - 109352-E Rev. A 4-7

Installing and Maintaining BN Platforms2-6 109352-E Rev. ASpace RequirementsMake sure the installation site is large enough for the BLN-2 and provides

Page 92 - 4-8 109352-E Rev. A

Installing the Backbone Link Node-2109352-E Rev. A 2-7 Environmental RequirementsThe installation site must meet the environmental requirements listed

Page 93 - Air Flow

Installing and Maintaining BN Platforms2-8 109352-E Rev. Ab. Locate the next two holes below this spot that have a 0.625-in. space between them.2. Mou

Page 94 - BACKBONE NODE

Installing the Backbone Link Node-2109352-E Rev. A 2-9 Figure 2-2. Locating the Mounting Holes0.625"1.125"1.750"2.375"Mounting Hol

Page 95

Installing and Maintaining BN Platforms2-10 109352-E Rev. AFigure 2-3. Attaching Angle Brackets to Support the BLN-2Bracket(2 Places)Screw(2 Places)If

Page 96

Installing the Backbone Link Node-2109352-E Rev. A 2-11 Installing the BLN-2 Install the BLN-2 in the electronic enclosure rack as follows:1. Using bo

Page 97 - Chapter 5

Installing and Maintaining BN Platforms2-12 109352-E Rev. A2. Insert the BLN-2 in the rack as shown in Figure 2-5. Make sure the BLN-2 rests squarely

Page 98 - 5-2 109352-E Rev. A

Installing the Backbone Link Node-2109352-E Rev. A 2-13 Powering On the BLN-2Power on the BLN-2 as follows:1. Ensure that the power switches on the re

Page 99 - 109352-E Rev. A 5-3

Installing and Maintaining BN Platforms2-14 109352-E Rev. ALED Activation SequenceThe LEDs on the front panel of the BLN-2 (Figure 2-6) activate while

Page 100 - 109352-E Rev. A

Installing the Backbone Link Node-2109352-E Rev. A 2-15 The BLN-2 indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs

Page 101 - Protecting Memory Card Files

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only (continued) D. O.

Page 102 - Unprotected

Installing and Maintaining BN Platforms2-16 109352-E Rev. A3. Insert the female end of the cable into the ANSI console communications port.Figure 2-7.

Page 103 - 109352-E Rev. A 5-7

Installing the Backbone Link Node-2109352-E Rev. A 2-17 2.Remove the cable connector from the CONSOLE port of the System Resource Module-Link (SRM-L).

Page 105 - 109352-E Rev. A 5-9

109352-E Rev. A 3-1 Chapter 3Installing the BCN and BCN RLCYou install the Backbone Concentrator Node (BCN) by• Preparing for installation• Setting up

Page 106 - 5-10 109352-E Rev. A

Installing and Maintaining BN Platforms3-2 109352-E Rev. ABackbone Concentrator Node OverviewThe BCN is a multiprotocol router/bridge designed to sati

Page 107 - 109352-E Rev. A 5-11

Installing the BCN and BCN RLC109352-E Rev. A 3-3 Figure 3-1. Backbone Concentrator Node (BCN)Preparing for InstallationTo prepare for the BCN install

Page 108 - 5-12 109352-E Rev. A

Installing and Maintaining BN Platforms3-4 109352-E Rev. AShipment ContentsVerify that the items in the BCN shipment match the items on the packing li

Page 109 - 109352-E Rev. A 5-13

Installing the BCN and BCN RLC109352-E Rev. A 3-5 Additional EquipmentYou need to supply the additional equipment listed in Table 3-2.Site Requirement

Page 110 - 5-14 109352-E Rev. A

Installing and Maintaining BN Platforms3-6 109352-E Rev. AElectrical RequirementsThe installation site must provide a power source that meets the foll

Page 111 - B A C K B O N E N O D E

Installing the BCN and BCN RLC109352-E Rev. A 3-7 Space RequirementsMake sure the installation site is large enough for the BCN and provides sufficient

Page 112 - Power Switch

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Canada Requirements Only (continued) Canad

Page 113 - 109352-E Rev. A 5-17

Installing and Maintaining BN Platforms3-8 109352-E Rev. AEnvironmental RequirementsThe installation site must meet the environmental requirements lis

Page 114 - Replacing a Power Module

Installing the BCN and BCN RLC109352-E Rev. A 3-9 Figure 3-2. Locating the Mounting Holes2.Mount the angle brackets in the area indicated by Figure 3-

Page 115 - 109352-E Rev. A 5-19

Installing and Maintaining BN Platforms3-10 109352-E Rev. Ab. Align the edge of the brackets to the rack:-- If the interior of the rack contains horiz

Page 116 - 5-20 109352-E Rev. A

Installing the BCN and BCN RLC109352-E Rev. A 3-11 Figure 3-3. Attaching Brackets to Support the BCNBracket(2 Places)Height 28 in. (71 cm)

Page 117 - 109352-E Rev. A 5-21

Installing and Maintaining BN Platforms3-12 109352-E Rev. AInstalling the BCNPrepare the BCN for installation as follows:1. Remove each power module (

Page 118

Installing the BCN and BCN RLC109352-E Rev. A 3-13 2.Lift and remove the BCN from its shipping platform and place it gently on the floor.3. Using both

Page 119 - 109352-E Rev. A 5-23

Installing and Maintaining BN Platforms3-14 109352-E Rev. AInstall the BCN in the electronic enclosure rack as follows:1. Insert the BCN in the rack a

Page 120 - 1. Remove the front bezel

Installing the BCN and BCN RLC109352-E Rev. A 3-15 2.Insert and tighten the screws with a screwdriver until secure.Replace the front bezel as follows:

Page 121 - 109352-E Rev. A 5-25

Installing and Maintaining BN Platforms3-16 109352-E Rev. AFigure 3-7. BCN and BCN RLC Power Systems5.Verify that the POWER OK LED on each power modul

Page 122

Installing the BCN and BCN RLC109352-E Rev. A 3-17 If an LED is not on, replace the power module. (Refer to Chapter 5, “Hot-Swapping Hardware Componen

Page 123

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 T1 Service Compliance Statements T1 Service

Page 124 - 5-28 109352-E Rev. A

Installing and Maintaining BN Platforms3-18 109352-E Rev. AFigure 3-9. BCN Front-Panel LEDsThe LEDs typically activate in the following order (the seq

Page 125 - Switches and LEDs

Installing the BCN and BCN RLC109352-E Rev. A 3-19 The BCN indicates a successful start-up by turning off the BOOT LED. The POWER and RUN LEDs remain

Page 126 - Front-Panel LEDs

Installing and Maintaining BN Platforms3-20 109352-E Rev. AEstablishing a Local or Remote Connection to the BCNYou can cable a BCN to an ANSI console

Page 127 - 620-Watt Power Module LED

Installing the BCN and BCN RLC109352-E Rev. A 3-21 Figure 3-10. Cabling the BCN to a ConsoleRemote ConnectionCable the BCN to the modem as follows:1.

Page 128 - Power OK

Installing and Maintaining BN Platforms3-22 109352-E Rev. A2. If you have not already done so, remove the cable connector from the CONSOLE port of the

Page 129 - Dial-Up Services Modems

109352-E Rev. A 4-1 Chapter 4Accessing the InteriorExperienced network operators can safely perform the user-serviceable procedures that are described

Page 130 - Adtran DSU III AR

Installing and Maintaining BN Platforms4-2 109352-E Rev. ARemoving and Replacing the Front BezelYou must remove the front bezel (front cover) of BLN,

Page 131 - Codex 3260

Accessing the Interior109352-E Rev. A 4-3 Figure 4-2. Removing the BLN-2 Front BezelRemove the front bezel from the BCN (Figure 4-3) as follows:1. Usi

Page 132 - Codex 3261 Fast

Installing and Maintaining BN Platforms4-4 109352-E Rev. AFigure 4-3. Removing the Front Bezel from the BCNPOWERRUNBOOTDIAGB A C K B O N E N O D ERES

Page 133 - Multi-Tech Multi-Modem

Accessing the Interior109352-E Rev. A 4-5 Attaching the Antistatic Wrist StrapEach BLN, BLN-2, BCN, and BCN RLC ships with an antistatic wrist strap.

Page 134 - NEC N6450 Data Service Unit

Bay Networks, Inc. 4401 Great America Parkway, Santa Clara, CA 950548 Federal Street, Billerica, MA 01821 Bay Networks Software License This Software

Page 135 - NEC N963E Plus (RS232)

Installing and Maintaining BN Platforms4-6 109352-E Rev. AFigure 4-4. Connecting the Wrist Strap Jack to the Antistatic ReceptacleRemoving and Replaci

Page 136 - Telebit T3000

Accessing the Interior109352-E Rev. A 4-7 Remove the EMC shield (Figure 4-5) as follows:1. Remove the front bezel. (Refer to “Removing and Replacing t

Page 137 - Telebit T3000 (continued)

Installing and Maintaining BN Platforms4-8 109352-E Rev. AFigure 4-5. BLN and BCN EMC ShieldsVOR jeglicher Intervention GeratABSTELLEN und Netzstecker

Page 138 - - Tested with V.25bis only

Accessing the Interior109352-E Rev. A 4-9 Removing and Installing an Air Flow ModuleBay Networks ships an air flow module in each empty FRE/FRE-2 slot

Page 139 - 109352-E Rev. A Index-1

Installing and Maintaining BN Platforms4-10 109352-E Rev. Ab. Remove the bracket.4. Pull the front of the air flow module forward to remove it (Figure

Page 140

Accessing the Interior109352-E Rev. A 4-11 Figure 4-8. Grasping the Air Flow ModuleBack Edge of Air Flow ModuleSpace for Locating PinSpace for Power C

Page 142

109352-E Rev. A 5-1 Chapter 5Hot-Swapping Hardware ComponentsDepending on your hardware platform, you can replace the following user-serviceable hardw

Page 143 - 109352-E Rev. A Index-5

Installing and Maintaining BN Platforms5-2 109352-E Rev. ADepending on your model, you will need a Phillips screwdriver, a standard screwdriver, or bo

Page 144

Hot-Swapping Hardware Components109352-E Rev. A 5-3 Memory Card Read-Write Protect SwitchMemory cards are read-write protected. To change the protecti

Comments to this Manuals

No comments