Chapter 1 Getting started 11
Installation Checklist and Quick Start Guide
Checklists
Before installing the BCM50 hardware, complete the following checklists. For more information,
see the Installation and Maintenance Guide.
General checklist
F Determine the location for the main unit (and optional expansion unit), telephones, and other
equipment based on spacing and electrical requirements.
F Order the required trunks from the central office.
F Ensure that you have all the equipment and supplies you need to install the system.
F Ensure that the system complies with the environmental requirements.
F Ensure that the system complies with the electrical requirements.
F Ensure that the system complies with the site telephony-wiring requirements.
Main unit components checklist
Check that you have the following components, and inspect the components for any damage:
F one main unit (either BCM50, BCM50a, BCM50e, BCM50b, BCM50ba, or BCM50be)
F one power supply
F one power-supply cable
F one power-supply retention clip
F four rubber feet
F one screw to secure the RJ-21 telephony connector
F one cable tie
F a documentation CD
F Installation Checklist and Quick Start Guide
Fractional T1 channel numbers
Frame relay DLCI/CIR (if applicable)
V.90 modem settings
(North America only)
SNMP agent (security, version)
SNMP manager IP address
SNMP community string
Table 5 System information (Sheet 2 of 2)
Description Value Comments
5 minutes