d) If there are no ping replies, enter ipconfig.
The results should list the IP address settings of the Manager PC as required
above.
e) If the IP address settings of the Manager PC are displayed, enter exit and
check the cable connection.
Applying power to the system
Procedure
1. With the power off on the control unit, insert the B5800 Branch Gateway System
SD card into the System SD slot on the rear of the control unit.
Ensure that you have the correct card. The B5800 Branch Gateway System SD
card is required for branch operation. The card is labeled System SD BRANCH
GW.
2. Apply power to the external expansion modules.
The power outlet used must include a switch and in cases where the power cord
includes an earth lead, that outlet must have a protective earth connection.
3. Apply power to the control unit.
The power outlet used must include a switch and the power outlet must have a
protective earth connection.
When power is applied to the control unit, the following occurs:
The control unit begins loading firmware from the System SD card with which
it will upgrade itself and the components installed in the control unit. This
process takes approximately a minute. The end of this process is indicated by
LED1 on each base card flashing every 5 seconds and LED9 on each base
card fitted with a trunk daughter card flashing every 5 seconds.
• The control unit will then begin upgrading the external expansion modules.
This is indicated by the red center LED on each module flashing red. The
process is completed when the LED changes to steady green.
Applying power to the system