Avaya G700 User Manual Page 605

  • Download
  • Add to my manuals
  • Print
  • Page
    / 768
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 604
Preparing for the upgrade to R3.1 on-site
Issue 9.1 June 2006 605
Perform the following procedures if you are upgrading an S8300 that is configured as a primary
controller:
To clear alarms
To check link status
To record all busyouts
To disable scheduled maintenance
To check for translation corruption
To save translations
To stop Communication Manager on an LSP
To disable alarm origination
Note:
Note: It is no longer necessary to disable Terminal Translation Initialization (TTI) before
an upgrade or to enable it after an upgrade.
To clear alarms
1. On the Maintenance Web Interface under Alarms, click Current Alarms.
2. If no alarms are listed, skip the next two steps.
3. If alarms are listed, click Clear All.
4. Resolve any remaining major alarms through the Communication Manager SAT.
To check link status
1. Open a SAT session.
2. Enter display communication-interface links.
Note all administered links.
3. Enter status link number for each administered link.
4. Enter list signaling group.
Note the signaling groups listed by number.
5. For each of the signaling groups listed, enter status signaling group number.
Make a note (write down) of any links that are down.
To record all busyouts
1. At the SAT prompt, type display errors and press Enter.
2. Look for type 18 errors and record (write down) any trunks that are busied out — you will
return them to their busy-out state after the upgrade.
Page view 604
1 2 ... 600 601 602 603 604 605 606 607 608 609 610 ... 767 768

Comments to this Manuals

No comments