Installing IP500/IP500 V2 Page 171
15-601042 Issue 28g (11 October 2013)IP Office 9.0
Additional Processes: Out of Building Telephone Installations
8.9.2 Analog Phone Barrier Box
Where analog phone extensions are required in another building, additional protective equipment must be used, in the
form of IP Office Phone Barrier Boxes and protective earth connections.
· CAUTION
PHONE (POT) ports on the front of control units must not be used for extensions that are external to the main
building.
· The correct IP Office specific barrier boxes must be used. These modules have been designed specifically for the
signalling voltages used by the IP Office system:
· Only the IP Office Phone Barrier Box should be used with Phone V1 modules.
· Only the IP Office Phone Barrier Box V2 should be used with Phone V2 modules.
· No other type of analog phone barrier box should be used.
· Where more than 3 barrier boxes are required in a building, they must be rack mounted using a Barrier Box rack
mounting kit .
· A maximum of 16 barrier boxes can be used with any Phone module.
· The Phone Barrier Box does not connect the ringing capacitor in Phone V1 modules.
Main Building
Barrier Box
Secondary Building
· RJ11
Connect to PHONE (POT) port on the Phone
module using cable supplied with the barrier
box.
· RJ45
Connect to the secondary building barrier box
via primary protection in both buildings.
· RJ11
Connect to analog phone. Cable not
supplied.
· RJ45
From main building via primary
protection in both buildings.
· Center Screw
Connect to main building protective ground
(or ground terminal of Barrier Box Rack
Mounting Kit). Use 18AWG (minimum) wire
with a green and yellow sleeve.
· Right-Hand Screw
Connect to ground point on Phone module
using ground cable supplied with barrier box.
· Center Screw
Connect to main building protective
ground. Use 18AWG (minimum) wire
with a green and yellow sleeve.
· Right-Hand Screw
Not used.
1.The following wires must be kept apart, that is not routed in the same bundle:
· Earth leads from the barrier box to the Phone modules.
· Internal wires, for example extension leads going directly to the Phone modules.
· Wires from external telephone going directly to the barrier boxes.
IP Office Barrier Boxes
SAP Code
IP400 Phone Barrier Box (81V)
Use with Phone V1 module. Includes an RJ45 to RJ11 cable and a
functional earth lead.
700293897
IP400 Phone Barrier Box V2 (101V)
Use with Phone V2 module. Includes an RJ45 to RJ11 cable and a
functional earth lead.
700385495
Barrier Box Rack Mounting Kit
700293905