Avaya IP500 V2 Operations Instructions Page 75

  • Download
  • Add to my manuals
  • Print
  • Page
    / 442
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 74
Installing IP500/IP500 V2 Page 75
15-601042 Issue 28g (11 October 2013)IP Office 9.0
IP500 V2 Installation:
4.1 Tools and Equipment Required
The following is a general summary of the tools required. Additional tools and equipment will be
required for wall and or rack mounting and to fashion ground cable connections suitable to local
requirements.
· Tools Required
· o 5mm Flat-blade screwdriver.
· o Crosshead screwdriver.
· o Anti-static wrist strap and ground point.
· o RJ45-RJ45 Ethernet LAN Cable.
· o M4 Cross-Head Screwdriver.
· o Tools suitable for crimping a cable spade.
· o If wall mounting, drills and tools for wall mounting fixtures.
· Additional Parts Required
In addition to orderable IP Office equipment, the following items will be required.
· o 14AWG Solid copper wire for ground connection of control units and expansion modules.
· o Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional
ground and green/yellow for a protective ground.
· o If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.
· o Cable ties and labels for tidying and identifying cables.
· System Administration
1.o Selected method for system administration:
· Windows PC with IP Office Admin suite installed and RJ45 Ethernet LAN port.
2.o SD Card reader.
67
Page view 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 441 442

Comments to this Manuals

No comments