Avaya IP500 V2 Operations Instructions Page 279

  • Download
  • Add to my manuals
  • Print
  • Page
    / 442
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 278
Installing IP500/IP500 V2 Page 279
15-601042 Issue 28g (11 October 2013)IP Office 9.0
System Components: IP400 Expansion Modules
10.10 Mounting Kits
The following mounting kits are available for use with IP Office systems.
10.10.1 IP500 Wall Mounting Kits
IP500, IP500 V2 control units and IP500 external expansion modules can be wall or rack mounted. To do this, a wall
mounting kit is required in addition to suitable wall fixings.
In addition to the existing environmental requirements for an IP Office system, the following additional requirements
apply when wall mounting a unit:
· The wall surface must be vertical, flat and vibration free. Attachment to temporary walls is not supported.
· Only the screws provided with the mounting kit should used to attach the brackets to the control unit.
The following wall and rack mounting kit is currently available:
· IPO IP500 RACK MNTG KIT V3 (SAP Code 700503160)
These kits can be used for wall and rack mounting of an IP500 or IP500 V2 control unit and IP500 external
expansion modules. The kits incorporates cable routing at the front and rear of the unit. For wall mounted control
units it allows orientation of the control unit base card slots to the left or to the right.
10.10.2 Barrier Box Rack Mounting Kit
· Barrier Box Rack Mounting Kit (SAP 700293905)
Barrier boxes must be used for out-of-building analog phone
extensions . This bracket allows up to 8 IP Office barrier boxes to
be rack mounted and simplifies the number of connections to the
protective ground point in the rack. This kit must be used when more
than 3 barrier boxes are in use and supports a maximum of 16
barrier boxes for a single external expansion module.
60
45
Page view 278
1 2 ... 274 275 276 277 278 279 280 281 282 283 284 ... 441 442

Comments to this Manuals

No comments